Spring 2014

Yorktown Naval Weapons Station

General Contractor

WM Jordan

Superintendent

Mike Beard

Total Building Area

227,000 SF

Total Blocks Built

35 Stores

The project consisted of 3 buildings: the 7,000 SF P-986 Motor Transportation Facility with Humvee washout station and sediment pits; the 30,000 SF P-987 warehouse with loading docks; and the P-989 7,000 SF armory with an 8″ topping slab. Bayside Concrete installed the foundations, pedestals, ramps, stairs, loading docks, apron slab, dumpster pads, bollards, interior slab on grade, exterior slab on grade, beams, wash rack, columns, and roof slab on metal deck.